204-224-1565

limestone

Repair of the Assiniboine Riverwalk 815-2013

  • 82efa62102242016607fb62a0c2147a3.jpeg

    82efa62102242016607fb62a0c2147a3.jpeg

RESTORING A WINNIPEG LANDMARK DAMAGED BY FLOOD WATERS

The Assiniboine Riverwalk is a distinctive attraction situated in downtown Winnipeg, winding along the riverbanks underneath Esplanade Riel all the way to the foot of the Manitoba Legislature. When the Assiniboine Riverwalk was damaged by floodwaters in 2011, Chabot with our proven expertise and capability, completed the flood protection and restoration work on-time and on-budget.

Type of Service: Flood Protection, Riverbank and Shoreline Restoration

Client: City of Winnipeg

Consultant: KGS Group

Location: Winnipeg, Manitoba

Year: 2013

Project Overview

The work consisted of repairs to address flood damage and reinstate the Assiniboine Riverwalk to its pre-2011 flood condition.

Scope of Work

  1. Site development and restoration
  2. Placement of additional rockfill riprap material along the shoreline down to the channel bottom to restore the original rockfill berm design geometry
  3. Resetting or replacing the limestone curb located along the shoreline edge of the Assiniboine Riverwal

chabot logo

PHONE: (204) 224-1565
FAX: (204) 222-4754
EMAIL: INFO@CHABOTENTERPRISES.CA

HEAD OFFICE
25002 Hazelridge Road
Oakbank, Manitoba R5N 0E9